Eight stages · One crew

From chalk line to handover.

Every stage is sequenced by one crew so slab elevation, curing, base-rail alignment, and steel erection happen on one clean schedule.
  1. Blue chalk line snapped over compacted crushed limestone gravel pad with framing square and survey stake at dusk in Memphis

    Step 1 · Layout

    Turnkey concrete and steel buildings.

    It starts with a chalk line. One Mid-South crew pours the concrete slab and erects the steel. Choose Tubular Steel or Commercial Red-Iron below.

  2. Concrete slab perimeter forms, 6-mil vapor barrier, #4 rebar grid on chairs, thickened-edge footing, and anchor bolt templates

    Step 2 · Forms

    The steel goes in before concrete.

    Rebar sits on chairs over a continuous vapor barrier, perimeter edges get a thickened footing, and red-iron projects set cast-in-place anchor bolt templates before concrete arrives.

  3. Concrete crew screeding and finishing a 3,500 PSI monolithic concrete shop slab at dusk

    Step 3 · Pour

    One crew pours the slab.

    The same crew places, screeds, and finishes your 3,500 to 4,000 PSI concrete floor, saw cuts control joints, and cures the slab before steel erection begins.

  4. Heavy red-iron steel column bolted on leveling nuts and grouted base plate over cured concrete slab

    Step 4 · Columns

    Steel anchors straight to the slab.

    Tube-frame base rails anchor tight into cured concrete, while commercial red-iron columns bolt onto leveling nuts and grouted base plates so structural loads bear straight into the slab.

  5. Clear-span steel rigid frames and structural roof assembly bolted cleanly over concrete floor

    Step 5 · Frames

    Clear span roof. No inside posts.

    Clear-span trusses on tube-frame builds and bolted knee-haunch rigid frames on red-iron builds span the entire floor with zero interior posts blocking your lift, boat, or fleet.

  6. Galvanized roof purlins, wall girts, and diagonal wind bracing connecting steel building frames

    Step 6 · Bracing

    Bracing ties the frame together.

    Hat channel purlins, girts, and wind bracing tie every bay together square so your building shrugs off Mid-South storms.

  7. Installer driving sealing-washer metal roof panel screws cleanly into galvanized steel framing

    Step 7 · Panels

    Roof and wall panels close it in.

    Painted steel roof and wall panels fasten with neoprene sealing-washer screws, finished off with ridge cap, rake trim, and drip flashing.

  8. Completed charcoal steel workshop at dusk with roll-up garage door opening over poured concrete slab

    Step 8 · Done

    Roll the door up. It's yours.

    One price covering concrete and building, one schedule, one crew to call. Roll the door up and move in your truck, lift, boat, or business.

Usually it takes two contractors.

Most buyers hire a concrete company, wait weeks, then hire a building crew and hope the slab dimensions line up. We do both concrete and steel, so nothing falls between two schedules.

The usual way

Concrete co.WaitingBuilder

Bluff City Buildings

One crew, concrete slab to steel
  1. 01

    Site prep

    Clear, grade, and square a compacted gravel pad on your lot.

  2. 02

    Concrete slab

    Forms, vapor barrier, #4 rebar, thickened edge, and saw-cut finish.

  3. 03

    Steel building

    Certified framing, panels, trim, and doors anchored on the slab we poured.

  4. 04

    One schedule

    One crew, one calendar, one number to call from stake to handover.

Free site & lot estimate

Tell us about your lot.

Send the basics and we'll call you to talk through the site, concrete slab specs, building size, and a real turnkey price. No obligation.
  • One turnkey scope covering site prep, concrete slab, and steel building (Tier 1 Tube-Frame planning estimates ~$25k to ~$35k; Tier 2 Red-Iron custom quoted).
  • Ask about payment plans. Available terms depend on your state (TN, MS, or AR).
  • Design yours in 3D first to attach exact roof, color, slab, and door specs automatically.

Monday through Saturday, 7:00 AM to 6:00 PM CT · Pricing reviewed November 27, 2026

Structural tier
Size (concrete + building planning estimate)

We only use your details to reply about your building.